NSW BESS (South Coast)

NSW BESS (South Coast)

Fortitude is proposing a Battery Energy Storage System (BESS) in South Coast of NSW.

Project development is currently underway with environmental and ecological surveys, Traditional Owner consultation, and detailed technical and engineering assessments progressing to confirm site suitability. Fortitude aim to lodge a scoping report in early 2026.

Status Early Development

Technology Battery Energy Storage System

Capacity 200MW

Location South Coast, NSW

Size 4 hectares

 

200MW / 800MWh

—————

Storage Capacity

4 Hectares

—————

Project Area

100

—————

Jobs Created

2029

—————

Expected Completion

Previous
Previous

Snowy Monaro Regional BESS